CURRENT PROJECTS

Planning

Elevator Upgrades

Design

Construction

Completed Projects
Description Benef. Occup.
Replace PCB Transformers 10.1999
Renovation 07.1999
Furnish/Install Bathroom Partitions 01.1996
Replace Bathroom Ceilings & Lights 09.1993
Rehab Showers & Tubs 09.1993
Alter/Improve Weather Strips & Windows 09.1993
Reset Exterior Stone 01.1992
Replace Roof 11.1991
Remove Soffits/Install Walkway Canopies 10.1990
Install Gas-Fired Water Heaters 04.1990
Provide Smoke Detectors for Residential Facilities 01.1990
Improve Fire Alarm System 08.1989
Structural Investigation 05.1989
Alter/Improve Non-Fire Rated Wood Paneling 05.1989
Replace Condensation Pumps 01.1989
Repair Transformers 06.1986
Repair Elevators 03.1985
Install Electric Meters 03.1984
Replace Fire Alarm Control Panels 09.1983
Replace Steam Converters & Water Heaters 10.1982
Replace Batteries & Battery Chargers 07.1980
Replace Exit Lights 06.1979
Replace Heating Equipment Insulation 12.1977
Replace Defective Domestic Hot Water Coil 10.1977
Install Heating Equipment Insulation 07.1977
Replacement of Fire Hoses 06.1976
Install New Batteries & Battery Chargers 02.1976
Replace Emergency Light Battery Bank 09.1974
Roof Repair 08.1972
Service Connections 01.1964
Construct Residence Hall 09.1963