Pathfinder Dining Hall Projects
CURRENT PROJECTS
Planning
Design
Construction
Completed Projects
Description | Benef. Occup. |
Dining Hall Renovations | 05.2017 |
Alterations for Safety | 08.1997 |
Refurbish Dining Hall Chiller | 06.1996 |
Repair Emergency Lighting | 08.1992 |
Replace Roof | 08.1992 |
Install Electric & Steam Meters | 04.1992 |
Replace Roof | 06.1991 |
Furnish/Install Hot Water Boilers | 12.1989 |
Develop ECM | 01.1988 |
Alter/Improve Ventilation | 10.1987 |
Replace Temperature Controllers | 06.1986 |
Repair/Replace Roof | 02.1986 |
Energy Conservation Study | 10.1985 |
Repair Tunnel Leaks | 09.1985 |
Install Fire Suppression System | 03.1985 |
Repair Absorption Chillers | 03.1984 |
Conversion of Basement | 09.1980 |
Install Basement Windows | 08.1980 |
Final Contract Payment | 08.1980 |
Replace Hot Water Heater | 09.1977 |
Correct Tunnel Leaks | 09.1975 |
Construct Dining Hall | 09.1967 |