Description Benef. Occup.
Dining Hall Renovations 05.2017
Alterations for Safety 08.1997
Refurbish Dining Hall Chiller 06.1996
Repair Emergency Lighting 08.1992
Replace Roof 08.1992
Install Electric & Steam Meters 04.1992
Replace Roof 06.1991
Furnish/Install Hot Water Boilers 12.1989
Develop ECM 01.1988
Alter/Improve Ventilation 10.1987
Replace Temperature Controllers 06.1986
Repair/Replace Roof 02.1986
Energy Conservation Study 10.1985
Repair Tunnel Leaks 09.1985
Install Fire Suppression System 03.1985
Repair Absorption Chillers 03.1984
Conversion of Basement 09.1980
Install Basement Windows 08.1980
Final Contract Payment 08.1980
Replace Hot Water Heater 09.1977
Correct Tunnel Leaks 09.1975
Construct Dining Hall 09.1967